Sydney Screeding

Flat, level floors that tiles can actually sit on

A to Z Tiling and Waterproofing screeds floors across Sydney, from sand and cement beds and self-levelling compounds to substrate repairs and falls to drain. Get the screed right and everything laid on top of it stays flat, drains properly and lasts.

LevelLaser Checked Floors
FallsSet to Every Drain
20+ YearsExperience
6 YearWorkmanship Guarantee
The Problem

Where floors go wrong before the tiles go down

Almost every complaint about a finished floor starts underneath it. These are the screeding and preparation problems Sydney homeowners and builders call us about.

The floor is out of level before tiling even starts

Slabs are rarely flat. Lay tiles straight onto a dished or humped floor and you get lippage, rocking tiles and edges you can feel underfoot.

How we fix itWe check the whole floor with a laser and screed it to a true plane before a single tile is set.
Uneven tiled floor with visible lippage between tiles

The screed goes hollow, drums and cracks

A weak or badly bonded mix breaks up under load. Once the bed lets go, the tiles above it crack, drum and lift.

How we fix itPrimed substrate, correctly gauged mixes and compacted beds, bonded so the screed and slab work as one.
Cracked hollow screed bed lifting from a concrete slab

Water sits on the floor instead of running to the waste

Wet areas, laundries and balconies with no fall leave standing water, slippery surfaces and constant pressure on the waterproofing.

How we fix itScreeded falls set to every outlet, then water tested before waterproofing and tiling.
Water pooling on a tiled floor instead of draining

The old substrate is patched, pitted and full of holes

Ripped up tiles leave ridges of old adhesive, chipped concrete and soft patches that no amount of extra glue will hide.

How we fix itGrinding, dust extraction and substrate repairs first, so the screed goes onto sound, clean material.
Damaged concrete substrate with holes and old adhesive residue

Floor heights no longer match doorways and adjoining rooms

Renovations change floor build ups. Without planning you end up with steps at thresholds, doors that foul and trims that never look right.

How we fix itWe set finished floor levels first and screed to them, so thresholds, doors and transitions all line up.
Mismatched floor levels creating a step at a doorway threshold

Everyone is waiting on the floor to be ready

Screeding gets squeezed between trades, rushed or left to cure too little, and the whole program slips while the tiler stands around.

How we fix itOne team screeds, waterproofs and tiles, with realistic cure times built into a committed schedule.
Tradesmen waiting on an unfinished floor during a renovation
Screeding Services

Screeding services we provide

Sand and cement screeding a floor in Sydney

Sand & Cement Screeding

Traditional bonded sand and cement beds for bathrooms, laundries, balconies and whole floors, screeded to level or to fall and finished ready for tiling.

Self levelling compound poured over a concrete floor

Self-Levelling Screeding

Pumpable self-levelling compounds for large or badly out of level floors, giving a smooth flat surface for tiles, vinyl, timber or carpet.

Concrete floor preparation and substrate repair

Floor Preparation & Substrate Repair

Grinding, adhesive removal, crack and hole repairs, priming and moisture checks so the screed bonds to sound, clean substrate.

Renovation floor screed after tile removal

Renovation Screeds

Screeds set out to your finished floor levels during renovations, matching thresholds, doorways and adjoining rooms across timber and concrete floors.

Screed falls shaped toward a floor waste drain

Falls to Drain

Shower bases, wet room floors, laundries and balconies screeded to correct falls so water reaches the waste instead of sitting on the surface.

Why A to Z

Why Sydney homeowners and builders trust us with screeding

Every floor is laser checked, not eyeballed

We measure the existing floor across its full span, set datum levels and screed to a true plane, so the finished surface is flat where it matters.

Falls designed before the screed is mixed

Drain positions, thresholds and door openings are all planned first, so water runs to the waste and nothing ponds against a doorway.

Screeding, waterproofing and tiling by one team

The people preparing your floor are the people tiling it, so the screed suits the membrane and tile system instead of fighting them.

Honest cure times and a written guarantee

We give realistic drying and cure times up front rather than rushing tiles onto green screed, and back the work with a 6 year workmanship guarantee.

How It Works

From site check to a floor ready to tile

01

Free Assessment

We measure levels across the floor, check the substrate and drain positions, and confirm the finished floor height you need.

02

Scope and Fixed Quote

An itemised quote covering preparation, screed type, thickness, falls and cure time, with no surprises once we start.

03

Preparation and Screeding

Grinding, repairs and priming first, then the screed laid, compacted and finished to level or to fall.

04

Check, Cure and Hand Over

Levels and falls rechecked, cure time allowed, then the floor handed over ready for waterproofing or tiling.

Sydney harbour and city skyline at golden hour
ServicingGreater Sydney
Service Area

Screeding across Sydney

We screed floors for homeowners, renovators and builders right across the Sydney metropolitan area, from single bathrooms to full floor levels.

01

Sydney CBD & Inner West

Apartment bathrooms and level access floors

02

Western Suburbs

New build slabs and whole house screeds

03

Eastern Suburbs

Renovation screeds and wet room falls

04

Northern Sydney

Timber floor levelling and substrate repairs

05

Southern Sydney

Laundry, balcony and shower base falls

06

The Hills District

Large format floors and self-levelling work

Not sure if we cover your suburb? Call 0481340386 and we will let you know.
Our projects

Recent screeding and floor preparation projects

Screeds, levelling and falls to drain — the work that sits under a good floor.

Video
Sand and cement screed bed laid across a floor
Video
Old tiles and bedding stripped back to substrate
Video
Pool surround screeded to fall before paving
Large format floor tiles laid over a levelled screedFloor
Large format floor laid over a levelled screed
Self levelling compound finished over a concrete floorSelf-Level
Self-levelling compound over an out of level slab
Shower base screeded to falls at the floor wasteFalls
Shower base screeded to falls at the waste
Video
External stairs screeded and finished in bluestone
Waterproofed shower base over a screeded floorWet Area
Screed, membrane and shower base ready to tile
Curved tiled floor set out over a flat screedSet-Out
Curved set-out made possible by a flat screed
Sand and cement screed bed being levelledScreed
Bonded sand and cement bed screeded to level
Entry landing screeded to fall and tiledEntry
Entry landing screeded to fall, then tiled
FAQ

Common questions

What is floor screeding and do I actually need it?

A screed is a levelling layer laid over a slab or timber floor before the final finish. Most floors are not flat or do not have the fall they need, so a screed is what gives tiles, vinyl or timber a true surface to sit on.

What is the difference between sand and cement screed and self-levelling?

Sand and cement screeds are trowel applied, can be built up thicker and are ideal for creating falls to a drain. Self-levelling compounds are poured and flow out to a very flat finish, best for correcting out of level floors before tiling or sheet flooring.

How long does a screed take to dry before tiling?

It depends on thickness, product and site conditions. Self-levelling compounds are often ready for tiling within 24 to 48 hours, while thicker sand and cement screeds usually need several days. We confirm cure times in your quote so your program is realistic.

Can you screed over an existing tiled or timber floor?

Often yes. Sound tiles can be prepared and primed, and timber floors can be screeded with the right system and reinforcement. We check the substrate first and tell you when removal is the better option.

Do you create falls to the drain for showers and balconies?

Yes. Falls to drain are a core part of our screeding work. We set the screed so water runs to the waste, then water test before waterproofing and tiling.

Is your screeding work guaranteed?

Yes, all screeding, preparation and tiling work is backed by our 6 year workmanship guarantee.

Get Started

Start with a floor that is right underneath

Book a free onsite assessment for screeding, levelling or falls to drain anywhere in Sydney.